According to the National Energy Administration (NEA), as of the end of December 2024, the country's cumulative installed power generation capacity was about 3.35 billion kilowatts, a year-on-year increase of 14.61 TP3T, of which, solar powerinstallCapacity of about 886 million kilowatts, wind power installed capacity of about 521 million kilowatts, the two combined installed capacity of 1.407 billion kilowatts, approaching thermal power 1.444 billion kilowatts of installed capacity.
It is worth mentioning that, as of the end of June 2024, the cumulative capacity of solar and wind power installed capacity was 1.18 billion kilowatts, which has exceeded the installed scale of 1.17 billion kilowatts of coal power, and this is the first time that China's new energy power generation installed capacity exceeded that of coal power.
In order to accelerate the construction of a new type of power system, provinces, autonomous regions and municipalities are also relying on local resource conditions to continue to develop new energy. As of the end of December 2024, 15 of China's 31 provinces, autonomous regions and municipalities have already installed new energy in the entire power structure accounted for more than thermal power, becoming the main power source.
These provinces are Qinghai, Gansu, Tibet, Hebei, Ningxia, Xinjiang, Guangxi, Hainan, Hunan, Inner Mongolia, Jiangsu, Hubei, Shandong, Henan, and Jilin, of which, the new energy installed capacity exceeded 100 million kilowatts of the province/region there are four, respectively, Xinjiang, Inner Mongolia, Hebei, Shandong.
Inner Mongolia
In 2024, Inner Mongolia new energy installed capacity of over 41 million kilowatts, once again refreshing the annual new energy installed capacity record. As of the end of 2024, the total installed capacity of new energy in Inner Mongolia reached 135 million kilowatts, one year ahead of schedule to achieve the goal of new energy installed capacity over thermal power installed capacity, is the "14th Five-Year Plan" at the beginning of the new energy installed capacity of 2.7 times.
In 2024, Inner Mongolia's new energy cumulative power generation capacity of more than 200 billion kilowatt-hours, of which the outgoing power amounted to 60 billion kilowatt-hours. 2025, Inner Mongolia will continue to accelerate the promotion of the "Shagoe Wilderness" base, sand control and wind power photovoltaic integration project and other new energy key projects, and strive to add new energy grid-connected installations within the year
Qinghai
By the end of December 2024, the total installed capacity of Qinghai power exceeded 71 million kilowatts, clean energy, new energy installed capacity accounted for 94.6%, 70%, the first in the country to realize the new energy installed capacity and power generation accounted for the "double main".
As of December 31, 2024, the clean energy installed capacity in Qinghai Province reached 67.888 million kilowatts, of which 16.445 million kilowatts were hydropower, 36.317 million kilowatts were photovoltaic, 12.683 million kilowatts were wind power, 210,000 kilowatts were photovoltaic heat, and 2.0 million kilowatts/6.61 million kilowatt-hours were energy storage.
Gansu
As of January 2, 2025, the installed power supply in Gansu Province exceeded 100 million kilowatts, of which the new energy installed capacity has reached 64.46 million kilowatts, accounting for 64% of the total installed capacity of the power supply. up to now, the province's in-operation thermal power of 26.16 million kilowatts, accounting for 26.1% of the total installed power supply, hydroelectric power of 9.71 million kilowatts, accounting for 9.7% of the total installed power supply, wind power and solar energy installed capacity of wind power and solar power have exceeded 31 million kilowatts, new energy has become the province's first major power source.
Gansu Province has rich energy resources reserves and a complete range of power sources, of which wind and solar energy technologies can be developed to 560 million kilowatts and 9.5 billion kilowatts respectively, ranking fourth and fifth in the country. At present, Jiuquan ten-million-kilowatt wind power base has been built, five one-million-kilowatt wind power bases have been built in Zhangye, Wuwei, Baiyin, Dingxi and Qingyang, and six one-million-kilowatt wind power bases have been built in Lanzhou, Wuwei, Jinchang, Zhangye, Jiuquan and Jiayuguan.photovoltaic power generationBase. The power supply in operation has formed a new pattern of "wind, light, water, fire and storage" multi-energy complementation.
Tibet
As of January 13, the proportion of clean energy in Tibet's installed power capacity reached 91.44%, basically realizing clean energy power supply. The data show that the installed capacity of hydropower, photovoltaic and wind power in Tibet currently accounts for 53.72%, 36.32% and 1.4% respectively.
It is reported that Tibet has abundant clean energy resources, with 180 million kilowatts of developable hydro resources, 9.8 billion kilowatts of developable photovoltaic resources, and 110 million kilowatts of developable wind energy resources, with huge development potential.
anhui
As of December 2024, the installed scale of wind power and photovoltaic power generation in Hebei Province has exceeded 100 million kilowatts, accounting for more than 60% of the total installed capacity of electric power, which is in the forefront of the country. Wind and photovoltaic power generation is gradually replacing coal power generation as one of the main energy sources in Hebei.
In recent years, Hebei has made every effort to promote wind power and photovoltaic projects. At present, the province produces more than 150 billion kilowatt-hours of green electricity annually, saving more than 45 million tons of standard coal annually, which can reduce carbon dioxide emissions by about 120 million tons. According to the province's unified planning and deployment, Hebei is accelerating the construction of wind, light, water, fire, nuclear, storage, hydrogen multi-energy complementary energy system, is expected to 2030 the province's new energy system initially formed.
Ningxia prefecture level city in Zhejiang
As of December 31, 2024, the installed capacity of new energy in Ningxia reached 41.32 million kilowatts, a year-on-year increase of 14.78%. The installed capacity of new energy in Ningxia has accounted for 57.83% of the total installed capacity of electricity in Ningxia.
Ningxia's average annual growth rate of new energy power generation capacity in the past five years was 12.57%, and the proportion of new energy power generation capacity in the total installed power capacity increased from 41.2% in 2019 to 57.8%, making it the fourth province in the country in which new energy is the first power source after Qinghai, Hebei and Gansu.
Xinjiang
As of December 30, 2024, Xinjiang new energy installed capacity of 35.57 million kilowatts, ranking first in the country, Xinjiang new energy installed capacity exceeded 100 million kilowatts, reaching 100.3 million kilowatts, becoming the first province in the western region of new energy installed capacity of more than one hundred million, of which, 43.64 million kilowatts of wind power installed capacity, photovoltaic installed capacity of 56.66 million kilowatts, accounting for the territory's total installed capacity of electricity. 55%, ranked fourth in the country, is the "14th Five-Year Plan" at the beginning of the installed capacity of 2.8 times.
"Xinjiang power transmission" is one of the ways to consume new energy, as of 2024, Xinjiang's cumulative power transmission exceeded 860 billion kilowatt-hours, of which new energy transmission accounted for nearly 30%. At present, Xinjiang is carrying out in-depth research and demonstration of the fourth and fifth extra-high-voltage (EHV) corridors focusing on deserts, Gobi, and desert areas, as well as research on the overall layout of Xinjiang's EHV corridors. Under construction "Xinjiang power outward" ultra-high voltage third channel - Hami-Chongqing ± 800 kV ultra-high voltage direct current transmission project, will be accessed wind power, photovoltaic, solar thermal and other new energy 10.2 million kilowatts, new energy power accounted for It is expected that after the project is completed and put into operation, Xinjiang's new energy power transmission will realize more than half of the green power.
until 1959, Guangxi province
In 2024, the scale of new energy installed in Guangxi exceeded 40 million kilowatts, amounting to 41.197 million kilowatts, an increase of 54.8%, accounting for 43.5%, becoming the first power source installed in Guangxi.
In 2024, Guangxi power grid only distributed photovoltaic on the cumulative grid 223,000 households, an increase of 1,51%; cumulative grid capacity of 10.36 million kilowatts, an increase of 1,59%. by accelerating the improvement of the institutional mechanism of the electric power market, expanding the scale of the green power trading, in 2024, Guangxi's green power trading power exceeded 9 billion kilowatts per hour.
Hunan
By the end of December 2024, the province's installed wind power and photovoltaic power generation reached 29.82 million kilowatts, surpassing traditional thermal power to become the first major installed power.
At the end of 2023, the new energy installed capacity for the first time more than hydropower to become the second largest power source in Hunan Province. 2024, Hunan continues to energy by "green". Further improve the new energy sector joint meeting mechanism, joint review and release 2024 wind power and photovoltaic power generation key project list, the total installed capacity of 8,698,000 kilowatts, and coordination of natural resources, forestry and other departments to speed up the approval of land for forests, supervise the construction of non-compliance with the project rectification, standardize the "complementary agriculture and light", distributed photovoltaic and distributed photovoltaic project management.
Jiangsu
As of the end of October 2024, Jiangsu's total installed power generation capacity exceeded 197 million kilowatts, a year-on-year increase of 13%. Among them, the installed capacity of new energy power generation has reached 82.52 million kilowatts, accounting for about 42%, which is more than the coal power in history, marking new energy to become the first power source in Jiangsu. New energy installed capacity, wind power, solar energy, biomass installed capacity accounted for the proportion of the total installed power generation capacity of 12%, 28%, 2%, accounting for a total installed capacity of 42%.
Jiangsu is one of the world's largest offshore wind power equipment integrated capacity base. Yancheng alone, offshore wind turbine production capacity accounted for more than 40%, offshore wind power installed capacity of more than 11.8 million kilowatts, ranked first in the country for many years. In addition, Jiangsu photovoltaic industry global leader. 2024 the first 10 months, Jiangsu distributed PV net installed capacity of more than 14 million kilowatts, ranked first in the country, the average monthly increase of more than 1.4 million kilowatts.
Hubei
As of November 2024, Hubei wind power, photovoltaic installed capacity of 41.2523 million kilowatts, accounting for the province's total installed capacity of power supply 34.39%, has exceeded the thermal power (accounted for 33.83%), hydroelectricity (accounted for 31.78%), the province's first power supply for the economic and social development of green power.
In order to meet the growing demand for electricity and adapt to the rapid development of new energy, Hubei has strengthened the construction of power grids, scientific and technological innovation and institutional mechanism innovation. January - September this year, the province's power grid project completed investment of 14.2 billion yuan, an increase of 27.8%. Central China ultra-high-voltage ring network will soon be completed, Hubei to accept foreign power channel plus ultra-high voltage grid of the new network pattern more solid.
Shandong
In 2024, the installed capacity of new energy and renewable energy will reach 115 million kilowatts, accounting for more than coal power in history, and Shandong's long-term "coal-heavy" energy structure will be fundamentally reversed.
As a large province of energy production and consumption, Shandong's total energy consumption and carbon emissions accounted for nearly 1/10 of the country, in the past, "a coal alone" problem is prominent. In recent years, Shandong to speed up the development and utilization of clean energy, planning and construction of nuclear power in Jiaodong Peninsula, offshore wind power, Lubei saline beach wind power storage and transmission integration, onshore wind power and other large-scale clean energy bases. Since the "14th Five-Year Plan", Shandong new energy and renewable energy installed capacity to an average annual growth rate of 25.2%. 2025, Shandong will strive to new energy and renewable energy installed capacity of 20 million kilowatts.
He'nan Mengguzu autonomous county in Qinghai
In 2024, the province's annual installed capacity of renewable energy power generation exceeded 75 million kilowatts, realizing the installed capacity of renewable energy power generation exceeding thermal power, new energy power generation installed capacity exceeding coal power of the "double transcendence", the installed capacity of renewable energy power generation accounted for a breakthrough in the ratio of 50%, the annual power generation exceeded 100 billion kilowatt-hours of the "Double breakthrough", reaching 115.8 billion kilowatt-hours, accounting for more than 30% of the province's power generation, accounting for more than a quarter of the proportion of electricity consumption of society as a whole.
With the rapid increase in the proportion of installed renewable energy, in order to integrate renewable energy consumption and safeguard the safety of the power grid, Henan issued a policy to clarify the fair participation of distributed photovoltaic operation and regulation, the first in the country to build a provincial distributed source network load storage synergistic control system to achieve distributed photovoltaic online group regulation and control of the group, the cumulative regulation and control of the 2023 total of 39 days, and effectively guarantee the safety and stability of the power grid operation.
also Jilin prefecture level city, Jilin province
In 2023, the installed capacity of new energy in Jilin Province reached 18.561 million kilowatts, including wind power, photovoltaic, biomass, including new energy installed capacity accounted for the province's total installed capacity of power generation of 40.4%, exceeding the coal power to become the first power source in the province.
In 2024, Jilin's new wind power installed more than 6 million kilowatts, 10 times the normal consumption capacity, new energy industry investment exceeded 110 billion yuan. Hydrogen-based green energy industrial park supporting 80% of the new energy to realize self-generated self-consumption, opening the country's first innovative energy supply mode. General public budget revenue increased by 10.8%.
Hainan Island
As of the end of November 2024, Hainan province in the generation of electricity on-line power, clean energy (including gas and electricity, energy storage) installed capacity accounted for 82.9%, power generation accounted for 69.14%, the energy transition in the forefront of the country, and early realization of the "dual-carbon" goal of the early advantage of the early start is obvious.
In 2025, Hainan initially built a clean, low-carbon, safe and efficient energy system, the proportion of installed clean energy power generation reached 83%, clean energy island is taking shape. By 2035, the basic realization of clean energy transformation, the proportion of clean energy installed power generation to reach 89%, Hainan clean energy island is basically built.

Special notice: Goodhao is reproduced from other websites for the purpose of transmitting more information rather than for profit, and at the same time does not mean to endorse its views or confirm its description, the content is for reference only. Copyright belongs to the original author, if there is infringement, please contact us to delete.