On August 19, Jiangsu Development and Reform Commission issued a notice on the template of distributed PV special distribution network planning program for counties (districts) in our province. In the face of the installed scale of distributed photovoltaic in Jiangsu Province, according to the status quo of distributed photovoltaic development, resources, load level and grid carrying capacity, targeted to do a good job in the planning of distributed photovoltaic projects within the grid consumption program.
Counties (districts) should analyze the development profile of source and load resources in each place, such as distributed PV development mode and output characteristics; centralized power supply scale status quo, output characteristics and future additions; electric load status quo resources and development.
Analyze the size of medium and high-voltage distribution network equipment in each region, the situation of backward transmission, as well as assessing the current electricity load and forecasting the electricity load for the next two years.
In the assessment and analysis of grid distributed PV carrying capacity, the final predicted scale needs to be formed by townships and administrative villages, such as the total number of households, the number of households, the development ratio and other indicators. To illustrate the remaining access capacity at the substation level, distribution substation level and line level, taking into account the "short-board effect", and illustrate the remaining access capacity of household distributed at each level of the current distribution grid. According to the power supply matching relationship between each distribution substation and each county village and town, sort out the remaining access capacity of distributed PV in each village.
The original text follows:
Notice on the release of the template of distributed photovoltaic special distribution network planning scheme for counties (districts) in our province
According to the "National Energy Administration on doing a good job of new energy consumption to ensure the high-quality development of new energy notice" (National Energy Development Electricity 〔2024〕 No. 44) and the "Provincial Development and Reform Commission on the high-quality to do a good job of the province's distributed photovoltaic grid connection and consumption of the notice" (Su Development and Reform Energy Development 〔2024〕 No. 906) requirements, the Commission, in conjunction with the provincial electric power company, prepared the "county (district) distributed photovoltaic special distribution grid planning programs for counties (districts) to carry out distributed PV special distribution network planning reference.
Annex: XX County (District) Distributed Photovoltaic Special Distribution Grid Planning Scheme
Provincial Development and Reform Commission
August 19, 2024
Special notice: Goodhao is reproduced from other websites for the purpose of transmitting more information rather than for profit, and at the same time does not mean to endorse its views or confirm its description, the content is for reference only. Copyright belongs to the original author, if there is infringement, please contact us to delete.